California Codes, Business and Professions Code - BPC, Division 3 — Professions and Vocations Generally, Chapter 7 — Professional Engineers, Article 3 — Application of Chapter, Section 6735.3
(a) All electrical engineering plans, specifications, calculations, and reports (hereinafter referred to as “documents”) prepared by, or under the responsible charge of, a licensed electrical engineer shall include his or her name and license number. Interim documents shall include a notation as to the intended purpose of the document, such as “preliminary,” “not for construction,” “for plan check only,” or “for review only.” All electrical engineering plans and specifications that are permitted or that are to be released for construction shall bear the signature and seal or stamp of the licensee and the date of signing and sealing or stamping. All final electrical engineering calculations and reports shall bear the signature and seal or stamp of the licensee and the date of signing and sealing or stamping. If electrical engineering plans are required to be signed and sealed and have multiple sheets, the signature, seal or stamp, and date of signing and sealing or stamping shall appear on each sheet of the plans. If electrical engineering specifications, calculations, and reports are required to be signed and sealed or stamped and have multiple pages, the signature, seal or stamp, and date of signing and sealing or stamping shall appear at a minimum on the title sheet, cover sheet, or signature sheet.
(b) Notwithstanding subdivision (a), a licensed electrical engineer who signs electrical engineering documents shall not be responsible for damage caused by subsequent changes to or uses of those documents, if the subsequent changes or uses, including changes or uses made by state or local governmental agencies, are not authorized or approved by the licensed electrical engineer who originally signed the documents, provided that the engineering service rendered by the electrical engineer who signed the documents was not also a proximate cause of the damage.
Notes
Requires electrical engineering plans, specifications, calculations, and reports prepared by or under a licensed electrical engineer’s responsible charge to contain the engineer’s name and license number and required signatures, seals or stamps, dates, and interim-purpose notations. Exempts the signing engineer from damage caused by unauthorized later changes or uses unless the engineer’s service also proximately caused the damage.
Use as reference
Lexinter.net | California Code, Business and Professions Code - BPC § 6735.3 | https://laws.lexinter.net/codes/california/business-and-professions-code/division-3/chapter-7/article-3/section-6735-3