California Codes, Civil Code - CIV, Division 3 — Obligations, Part 2 — Contracts, Title 3 — Interpretation of Contracts, Section 1657.1
Any time specified in a contract of adhesion for the performance of an act required to be performed shall be reasonable.
Notes
Requires every period stated in a contract of adhesion for performing an act required by that contract to be reasonable. The rule governs the amount of time allowed for required contractual performance and prevents an adhesion contract from imposing an unreasonable performance deadline.
Use as reference
Lexinter.net | California Code, Civil Code - CIV § 1657.1 | https://laws.lexinter.net/codes/california/civil-code/division-3/part-2/title-3/section-1657-1