California CodesCivil Code - CIVDivision 2 — PropertyPart 2 — Real or Immovable Property [755 – 945.5]Title 7 — Requirements for Actions for Construction DefectsChapter 4 — Prelitigation ProcedureSection 918
Upon receipt of the offer to repair, the homeowner shall have 30 days to authorize the builder to proceed with the repair. The homeowner may alternatively request, at the homeowner’s sole option and discretion, that the builder provide the names, addresses, telephone numbers, and license numbers for up to three alternative contractors who are not owned or financially controlled by the builder and who regularly conduct business in the county where the structure is located. If the homeowner so elects, the builder is entitled to an additional noninvasive inspection, to occur at a mutually convenient date and time within 20 days of the election, so as to permit the other proposed contractors to review the proposed site of the repair. Within 35 days after the request of the homeowner for alternative contractors, the builder shall present the homeowner with a choice of contractors. Within 20 days after that presentation, the homeowner shall authorize the builder or one of the alternative contractors to perform the repair.
Notes
Requires a homeowner to authorize a proposed repair within 30 days after receiving the offer, unless requesting up to three qualifying alternative contractors. That request allows an additional inspection within 20 days; the builder must present contractor choices within 35 days, and the homeowner must authorize the builder or an alternative within 20 days after presentation.
Use as reference
Lexinter.net | California Code, Civil Code - CIV § 918 | https://laws.lexinter.net/codes/california/civil-code/division-2/part-2/title-7/chapter-4/section-918