California Codes, Civil Code - CIV, Division 4 — General Provisions, Part 6 — Works of Improvement, Title 2 — Private Works of Improvement, Chapter 8 — Prompt Payment, Article 2 — Retention Payment, Section 8814
(a) If a direct contractor has withheld a retention from one or more subcontractors, the direct contractor shall, within 10 days after receiving all or part of a retention payment, pay to each subcontractor from whom retention has been withheld that subcontractor’s share of the payment.
(b) If a retention received by the direct contractor is specifically designated for a particular subcontractor, the direct contractor shall pay the retention payment to the designated subcontractor, if consistent with the terms of the subcontract.
(c) If a good faith dispute exists between the direct contractor and a subcontractor, the direct contractor may withhold from the retention to the subcontractor an amount not in excess of 150 percent of the estimated value of the disputed amount.
Notes
Requires a direct contractor, within 10 days after receiving all or part of a retention payment, to pay each affected subcontractor its share. Requires specifically designated retention to go to that subcontractor when consistent with the subcontract, while allowing withholding up to 150 percent of the estimated value of a good-faith dispute.
Use as reference
Lexinter.net | California Code, Civil Code - CIV § 8814 | https://laws.lexinter.net/codes/california/civil-code/division-4/part-6/title-2/chapter-8/article-2/section-8814